1、 Installation production line
The company has 6 SMT production lines, with high-precision printing and mounting capabilities, as well as online SPI and AOI precision detection capabilities.
2. Component and complete machine production line
It has 5 machine component production lines and final assembly lines, automatic component processing lines, automatic testing equipment, and automatic packaging lines.
3. Storage and logistics management capabilities
Equipped with multi-layer three-dimensional shelves and electric stacking trucks, entrusted to professional logistics and transportation companies to ensure the safe loading and transportation of goods.
4. Detection capability
Equipped with various electronic product environmental adaptability tests, various electronic product reliability tests, and various electronic product functions and performance testing services. Obtained CNAS certification certificate through on-site laboratory DILAC review.
1. Production governance regulations
1.1 Job allocation is determined by cadres with short or longer positions based on the needs of the work, and they are appointed
No personnel shall engage in picky work behavior (except in special circumstances, but must be confirmed by supervisory personnel)
1.2 The homework personnel must complete the homework according to the homework guidebook or machine operation manual. Changes in homework methods or special technical tasks must be confirmed by the supervisor level personnel before they can be executed.
1.3 Operators must conduct self inspection (including raw material inspection and component inspection) on the assembly line. Operators at each station need to progress to the previous station's operation inspection, and all operators are required to be familiar with their previous and next station's operation content
1.4 Operators must complete the production according to regulations to ensure work efficiency.
When encountering special situations in homework, it is necessary to report to cadres above the rank of leader on time and plead for handling.
1.6 When operators find that they have insufficient materials for their work, they need to report to the material handler, elongation or material requisition personnel one hour in advance to issue materials. They are not allowed to retrieve materials from the material rack without authorization.
Insertion production line
With multiple plug-in production lines and the ability to cover all aspects of spot welding, wave soldering, and selective welding, we provide users with professional product design, ODM services, and multi-dimensional production and manufacturing services.
The company has a research and development team of over 50 people, a national level enterprise technology center, multiple industry-university research joint laboratories, 3 State Council special experts, more than 10 technical experts, and more than 50% master's degree or above.